Qatar LNG Support Crew Deployment
The contractor required a high-volume industrial support crew with strong welding and piping capability during a planned shutdown and compressor relocation cycle.
Execution protocol
- Trade testing aligned to client WPS and plant permit standards
- Crop of candidates built around site-readiness and previous LNG exposure
- Batch medical and QVC workflows by worksite and shift pattern
- Phased arrival waves matched to shutdown windows
- Replacement plan prepared for any F-1 or medical non-acceptance
Verification & compliance
QVC biometrics + employer WPS testing + pipe and welding qualification validation across 3G, 4G and 6G work packages.
Client classification: LNG and Industrial Services Contractor
Sourcing corridors: india, pakistan
Mobilization funnel
| Metric | Value |
|---|---|
| Total Requisition | 410 |
| Cvs Screened | 2330 |
| Trade Tested In Person | 390 |
| Client Selected | 360 |
| Visas Stamped | 348 |
| Deployed Total | 336 |
| On Schedule Rate | 97% |
| Total Mobilization Days | 48 |
| Ninety Day Retention Rate | 99.1% |
Roles deployed
| Role | Headcount | Trade-test specifics |
|---|---|---|
| Welders | 96 | 3G/4G/6G welding coupons and visual inspection against WPS |
| Pipe Fitters | 82 | Isometric line-up, flange fit and hydrotest support |
| Heavy Vehicle Drivers | 48 | Route discipline, load handling and pre-use vehicle inspection |
| General Labourers and Helpers | 110 | Tool handling, rigging safely and worksite discipline checks |
Need a similar mobilisation plan?
We can build your own deployment schedule using the same role, verification and site-readiness logic behind this case study.